SSR Mining Inc. has filed a Form 8-K with the U.S. Securities and Exchange Commission on October 13, 2026, announcing the completion of a Technical Report Summary (TRS) for its Marigold Complex in Nevada. The report, prepared by SLR International Corporation and dated October 9, 2026, details the current state of the mining operation and is filed in accordance with Subpart 1300 of Regulation S-K.
The filing includes the TRS as Exhibit 99.1 and a corresponding consent of the qualified person as Exhibit 23.1. SSR Mining also furnished a news release dated October 13, 2026, which announced the results of the 2026 Marigold TRS, as Exhibit 99.2. The company notes that the information provided in Item 7.01 and the exhibits is being furnished and shall not be deemed "filed" for purposes of the Exchange Act.
The Technical Report Summary covers a wide range of operational and geological data for the Marigold Complex. It details the property description, including land tenure and required permits, as well as the history of exploration and past production at the site. The report also includes sections on geological setting, mineralization, exploration results, and data verification.
Key operational sections of the report address mineral processing and metallurgical testing, mining methods, and infrastructure requirements. It provides summaries of mineral resource and reserve estimates for both the Marigold and Buffalo Valley areas. Additionally, the report contains economic analyses, including cash flow summaries and sensitivity analyses, based on various metal price assumptions.
The filing outlines capital and operating costs, environmental studies, and plans for reclamation and permitting. It also details the workforce requirements and maintenance key performance indicators (KPIs) for the mining fleet. The report concludes with interpretations, recommendations, and a list of references used in the preparation of the technical summary.