Contango Silver & Gold Inc. announced the final batch of assay results from its Coleman surface drilling program at the Lucky Shot project in Alaska on November 18, 2026. The company reported a significant high-grade intersection from hole LSS26031, which returned 62.97 grams per tonne (g/t) of gold over a 3.92-meter interval. This result includes a subinterval of 325.20 g/t Au over 0.73 meters. The intercept lies below the modeled Coleman 4 vein and is currently interpreted as a new vein.

The Coleman surface drilling program, which began on June 22, 2026, and concluded on August 31, 2026, totaled approximately 5,800 meters across 27 holes. This phase targeted infill areas within the Coleman vein segment and step-out areas toward the Lucky Shot vein system. The release highlights several other significant results from pads C, F, and B, including an 48.75 g/t Au intercept over 0.30 meters in Coleman 3 and a 24.46 g/t Au intercept over 0.30 meters in Coleman 1.

In addition to surface results, the company provided an update on underground exploration progress. Underground development has advanced to 606 meters of the planned 830-meter program, or approximately 73%. The company has completed 29 underground drill holes totaling about 2,050 meters since resuming operations on September 16, 2026. Drilling is currently underway from the second station in the 2070E drift, with a second rig scheduled to mobilize to the 2300E drift. The company plans to continue drilling through February or March 2027.

Contango stated that the results from both surface and underground work will support an updated mineral resource estimate in late Q2 2027. This update, combined with other technical work, is intended to support a Feasibility Study scheduled for the second half of 2027. The company will host a conference call and webcast to discuss the results on Thursday, November 19, 2026, at 11:00 a.m. EST.